Procedures: Steps for a proper fire drill under SOLAS

0 comments
Procedures: Steps for a proper fire drill under SOLAS

Above image is used for illustration purposes only

Procedures: Steps for a proper fire drill under SOLAS

Fires onboard form a great part of maritime casualties. One way to address them is the proper training through efficient and regular drills, which ensure that crew members are ready to handle a fire onboard. But what are the steps to be followed for a proper fire drill?

MARITIME KNOWLEDGE | 04/10/18 Read in this series

As per SOLAS, fire drills must be carried out with specific frequency (depending the vessel’s type) in order to ensure crew’s familiarity with equipment and procedures:

Training

Fire is a critical situation requiring ‘all hands on deck’ to participate in the emergency. As such, all crew members should be assigned with tasks as per muster list, taking into consideration the type of the vessel, any special compartments’ requirements and the availability of systems onboard.

At initial stages of training (and drills), it is necessary to familiarize personnel with equipment and systems, prior engaging them to a full-scale scenario.

Special reference should be made on appropriate procedure of closing openings, doors, ventilating shafts, fire doors, in order to reduce the supply of oxygen to the fire and isolate smoke.

The stage of preparation and training during drills is the appropriate clothing & uniforms’ use. Fireman outfit should be tried by all available crew members so that all of them be able to react. The signals with tow line should be explained in order both fireman and line handler to be familiar with the signals.

As each area of the ship has a different method of approaching and attacking fire emergency situations, different ways and approaches should be considered and tested.

A full scale scenario is to be tested after completion of all initial training stages. The equipment and systems’ familiarization stage should be repeated during every change of crew.

Step by step drill

  • Crew members need guidance and senior officers (Chief officer/Chief Engineer) should provide detailed guidance for each step of drill. This will provide the necessary confidence to crew members on how to react during real situations.
  • Each drill should simulate reality as much as possible. Turning off lighting or use training smoke creates a close to reality environment.
  • Injured personnel evacuation with stretcher’s use should be part of the drill in order to provide training on different technics (vertical transfer, accommodation stairway use, etc.).
  • An effective briefing (toolbox meeting) should be the starting point of the drill. An effective debriefing and a written evaluation should be final stage of each drill.

SQE has developed a sample of toolbox meeting in order to be used as guidance onboard.

Leave a Reply

SSCP   CAS-002   9L0-066   350-050   642-999   220-801   74-678   642-732   400-051   ICGB   c2010-652   70-413   101-400   220-902   350-080   210-260   70-246   1Z0-144   3002   AWS-SYSOPS   70-347   PEGACPBA71V1   220-901   70-534   LX0-104   070-461   HP0-S42   1Z0-061   000-105   70-486   70-177   N10-006   500-260   640-692   70-980   CISM   VCP550   70-532   200-101   000-080   PR000041   2V0-621   70-411   352-001   70-480   70-461   ICBB   000-089   70-410   350-029   1Z0-060   2V0-620   210-065   70-463   70-483   CRISC   MB6-703   1z0-808   220-802   ITILFND   1Z0-804   LX0-103   MB2-704   210-060   101   200-310   640-911   200-120   EX300   300-209   1Z0-803   350-001   400-201   9L0-012   70-488   JN0-102   640-916   70-270   100-101   MB5-705   JK0-022   350-060   300-320   1z0-434   350-018   400-101   350-030   000-106   ADM-201   300-135   300-208   EX200   PMP   NSE4   1Z0-051   c2010-657   C_TFIN52_66   300-115   70-417   9A0-385   70-243   300-075   70-487   NS0-157   MB2-707   70-533   CAP   OG0-093   M70-101   300-070   102-400   JN0-360   SY0-401   000-017   300-206   CCA-500   70-412   2V0-621D   70-178   810-403   70-462   OG0-091   1V0-601   200-355   000-104   700-501   70-346   CISSP   300-101   1Y0-201   200-125  , 200-125  , 100-105  , 100-105  , CISM   NS0-157   350-018  , NS0-157   ICBB  , N10-006 test  , 350-050   70-534   70-178   220-802   102-400   000-106   70-411  , 400-101   100-101  , NS0-157   1Z0-803   200-125  , 210-060   400-201   350-050   C_TFIN52_66  , JN0-102  , 200-355   JN0-360   70-411   350-018  , 70-412   350-030   640-916   000-105   100-105  , 70-270  , 70-462   300-070  , 300-070   642-999   101-400   PR000041   200-101  , 350-030   300-070  , 70-270  , 400-051   200-120   70-178   9L0-012   70-487   LX0-103   100-105  ,